Timelines & Process
Questions about project duration, scheduling, and renovation process
How long does concrete need to cure before i can drive on a new garage pad in NB if i pour it in September?
For a standard residential garage slab, you'll want to wait a minimum of 7 days before driving a regular passenger vehicle on it, and a full 28 days b...
How many weeks of exterior work fit before New Brunswick winter?
You're realistically looking at about 20–22 usable weeks for exterior construction in New Brunswick — roughly early May through late September, with s...
What is a realistic timeline for a Dieppe basement apartment build?
A basement apartment in Dieppe typically takes 4 to 8 months from first permit application to move-in day, though the planning and approval phase alon...
How far in advance do i need to book a contractor in Fredericton for a spring renovation start?
In Fredericton's current market, you should be reaching out to contractors 3–6 months ahead of your target start date — meaning if you want work to be...
How long should a full gut renovation of a 1,500 sq ft bungalow take in Fredericton from start to move-in?
A full gut renovation of a 1,500 sq ft bungalow in Fredericton typically runs 6 to 12 months from permit approval to move-in day — and that range isn'...
How long does an oil-to-heat-pump conversion take in Fredericton?
Most oil-to-heat-pump conversions in Fredericton take 1–3 days for the installation itself, though the full process from first call to a running syste...
What's the realistic window for pouring concrete outdoors in New Brunswick — April through October or tighter than that?
In New Brunswick, the realistic working window for outdoor concrete is roughly mid-May through early October — about 4.5 months, not the full April-to...